Middle East Refinery - Emergency Control Valve Replacement

 

Customer Background

A large refinery in the Middle East needed to quickly replace critical control valve positioners during a scheduled maintenance shutdown to ensure the unit could resume operation within the planned window.

Project Challenges

The delivery timeline was extremely tight. The customer required selection, shipment, and installation within 30 days. The equipment had to withstand high temperature and high-sulfur gas conditions and be 100% original.

Solution

We provided Fisher FIELDVUE DVC6200 positioners paired with 657 actuators, and performed rapid verification based on the operating conditions. With stock availability and expedited logistics, the shipment was completed within one week.

Project Results

All equipment was commissioned successfully on the first attempt, meeting the maintenance window and preventing potential downtime losses of up to tens of thousands of dollars.

Customer Feedback

"Delivery was extremely fast, products were 100% original, and they were ready for on-site installation immediately upon arrival."

page-907-155

page-1268-634

 

Southeast Asia Chemical Plant - 3582 Positioner + 67CFR Pressure Regulator System Upgrade

 

Customer Background

A Southeast Asian fine chemical plant planned to upgrade its production line pressure control system to improve overall production stability and equipment reliability. The customer aimed to replace outdated equipment with high-precision smart positioners paired with corrosion-resistant pressure regulators, achieving automation upgrades.

Project Challenges

The existing equipment lacked precision and had slow response, failing to maintain stable outlet pressure, which affected production efficiency. The customer required compatibility, durability, and fast delivery.

Solution

We supplied Fisher 3582 positioners paired with 67CFR pressure regulators to achieve precise control and stable pressure output. All equipment underwent strict factory testing and was accompanied by detailed installation guidance and technical support, ensuring rapid deployment on-site.

Project Results

The new system was installed and commissioned smoothly. Valves responded quickly, pressure control accuracy significantly improved, production became more stable, and maintenance frequency decreased, resulting in higher overall operational efficiency.

Customer Feedback

"Delivery was fast, and the 3582 positioners with 67CFR regulators perform perfectly. The system is stable, responsive, and reliable. Excellent support from the supplier."